Installation time depends on area, access, existing-floor removal, subfloor condition, product requirements, and the fitting method. Some materials also need acclimation or curing time. For a Middletown home, ask for a schedule covering preparation and when rooms can be used again, rather than assuming the time spent laying boards is the whole project.
